home *** CD-ROM | disk | FTP | other *** search
/ Mac Magazin/MacEasy 25 / Mac Magazin and MacEasy Magazine CD - Issue 25.iso / Datenbanken & Hypercard / TimeCache Demo / TimeCache Demo Help / TimeCache Demo Help.rsrc / TEXT_131.txt < prev    next >
Text File  |  1996-04-12  |  20KB  |  173 lines

  1. ‚ÄúHow-to‚Äù Help
  2. In this How-to section,different subjects are grouped together by the section of TimeCache (e.g. the Daily Log or Job Sheet section) where you would perform that function. To get help on specific menu commands, look at the ‚ÄúMenu‚Äù Help section.
  3.  
  4. Introduction to TimeCache
  5. TimeCache lets you easily keep track of time and billing on projects. There are four basic parts to TimeCache:
  6. 1)  A data entry screen, called the Daily Log
  7. 2)  A database of information on projects you work on, comprised of Job Sheets for each project
  8. 3)  Timesheets for printing reports on each day‚Äôs activities and 
  9. 4)  An Archive for storing data on inactive projects.
  10.  
  11. How to navigate in TimeCache
  12. TimeCache has different sections, but you always see the different sections through the same window. You can quickly go from one section to any other by using the TimeCache Navigator palette, or commands in TimeCache‚Äôs ‚ÄúGo‚Äù menu or their command-key equivalents.
  13.  
  14. To go to another section, you can:
  15.  
  16.   1) Click on the name of that section in the TimeCache Navigator palette,
  17.  
  18.   2) Choose the name of that section from the ‚ÄúGo‚Äù menu, or
  19.  
  20.   3) Use the Command-key combination for that section: 
  21.   1 = Daily Log, 2 = Job Sheets, 3 = Timesheets, 4 = Archive.
  22.  
  23. To browse Job Sheets, Timesheets or Archived jobs, use the right or left arrows arrows on your keyboard or on the TimeCache Navigator palette. The left arrow goes to the previous card in the section you‚Äôre browsing. The right arrow goes to the next card. The up and down arrow keys go to the first and last cards, respectively, of each section.
  24.  
  25. How to show or hide the TimeCache Navigator palette
  26. You can make TimeCache Navigator palette go away by clicking the close box in its top left corner, or by choosing the ‚ÄúHide Navigator‚Äù command in the Go menu. If  you would like to bring it back on-screen, choose the ‚ÄúShow Navigator‚Äù command in the Go menu.
  27.  
  28. The Daily Log
  29. TimeCache‚Äôs Daily Log is where you enter your time each day. It has fields for client, project, activity and time. Each line stores one entry for each category. In addition, there is a rectangle at the end of each line that lets you store a note for eachentry. When you enter a note, the rectangle changes to a filled circle.
  30.  
  31. How to create Client, Project and Activity listings
  32. 1)  If you want to create a listing for a client not already entered on your client list, choose the ‚ÄúNew Client‚Äù command from the Daily Log‚Äôs TimeCache menu. If you want to select a client from your Client List, choose the ‚ÄúClient List‚Äù command. You can also use the ‚ÄúProject List...‚Äù command or click on an empty Client or Project line to bring up the Project List dialog, then click ‚ÄúNew‚Äù.
  33. 2)  Depending on which command you started with, either enter a new client name, or select a client name from your client list.
  34. 3)  A dialog appears, prompting you for a new project name. Enter a name and click ‚ÄúOK‚Äù.
  35. 4) When prompted, select an activity from your Activity List, or click ‚ÄúNew‚Äù to create a new Activity listing. Enter an hourly billing rate when prompted.
  36. 5) When the Hours dialog appear, enter the hours you‚Äôve spent on this project. Or have TimeCache time your work. See the section ‚ÄúHow to Time Your Work‚Äù, below.
  37. 6) When the Note dialog appears, you can enter a description that provides additional details.
  38.  
  39. As you complete each of the steps above, TimeCache enters the information for this project on the next empty line of your Daily Log screen. If you cancel at any point, you can complete the line by clicking one-by-one on the empty fields.
  40.  
  41. When you create a new project listing, TimeCache also creates a Job Sheet for that project. This is where data for each project is stored after you use the TimeCache menu‚Äôs ‚ÄúTransfer Data‚Äù command at the end of the day.
  42.  
  43. How to select a Project from your list
  44. After you‚Äôve created a project listing, you can enter that project again on the Daily Log by simply selecting it from the Project List dialog. To bring up the dialog, click on an empty Client or Project line on the Daily Log screen, or choose the ‚ÄúProject List...‚Äù command in the Daily Log‚Äôs TimeCache menu. When the dialog box appears, double-click on the project you want to select, or click on an entry once, then click ‚ÄúSelect‚Äù.
  45.  
  46. How to delete Daily Log Entries
  47. To clear the information on any single line, click on the line number at the left end of the line. To clear the entire Daily Log screen, use the ‚ÄúClear Daily Log‚Äù command in the TimeCache menu.
  48.  
  49. How to change Daily Log entries
  50. To change the client and project information on any line, click on the appropriate field for that line. To change a note, or to enter a note for a line where there isn‚Äôt one already, click the rectangle or circle symbol at the right end of the line.
  51.  
  52. How to remove Client or Activity listings
  53. You can delete listings from your Client or Activity lists with the ‚ÄúClient List...‚Äù and ‚ÄúActivity List...‚Äù commands. Select the appropriate command, click once on the listing you want to remove so that it is highlighted, and then click ‚ÄúRemove‚Äù. TimeCache asks you to confirm your action. Click ‚ÄúYes‚Äù to confirm, or ‚ÄúCancel‚Äù to leave your list intact.
  54.  
  55. How to remove Project listings
  56. You can delete job listings from Project list by archiving or deleting the Job Sheet for that project. See the descriptions for these actions in the Job Sheet section of this manual.
  57.  
  58. How to change billing rates
  59. TimeCache asks you for a billing rate for each activity listing you create. TimeCache uses this billing rate to calculate charges for each entry of each Job Sheet. To change the billing rate for any activity in your Activity list, choose the ‚ÄúChange Hourly Rate...‚Äù command from the Daily Log‚Äôs TimeCache menu. The new rate for that activity will go into effect on all subsequent entries for that activity. To update entries that have already been transferred to active Job Sheets, choose the ‚ÄúApply Current Rates‚Äù command from the Daily Log‚Äôs TimeCache menu.
  60.  
  61. How to time your work
  62. You can have TimeCache automatically track how much time you spend on a project. To initiate timing:
  63. 1)  Enter the client, project and activity on the Daily Log as you normally do.
  64. 2)  When the Hours dialog appears, click ‚ÄúTimer‚Äù or type Command-T. A ‚ÄúT‚Äù will appear in the hours line for that entry to remind you that you‚Äôre timing that line.
  65. 3)  If you want to stop timing, click on the ‚ÄúT‚Äù. A dialog will appear. Click ‚ÄúStop‚Äù and TimeCache enters the accumulated time. If you had a time entry in that field previously, it will include the previously logged amount and the time you‚Äôve just added. If you click ‚ÄúCancel‚Äù in the dialog, TimeCache continues timing that line.
  66. 4) If you are already timing a line when you start timing on another line, TimeCache tells you which line you are timing and asks if you want to stop timing that line. Click ‚ÄúOK‚Äù to start timing the new line, or ‚ÄúCancel‚Äù to leave things as they were.
  67.  
  68. You can add time to a project you have previously entered time for in the Daily Log. Just click on the Hours entry for that line and start timing. Any new time you log will be added to the time you had previously entered.
  69.  
  70. TimeCache continues timing a project until you stop it. Neither switching to another program, nor even quitting TimeCache and shutting down your Mac, will stop timing.
  71.  
  72. How to transfer Daily Log data to Job Sheets
  73. After you‚Äôve filled out a day‚Äôs worth of time entries, you need to transfer them to their respective Job Sheets with the ‚ÄúTransfer Data‚Äù command in the Daily Log‚Äôs ‚ÄúTimeCache‚Äù menu. TimeCache warns you if you try to transfer data for a line with no Activity entry, or if you try to transfer while you‚Äôre still timing a line.
  74.  
  75. After your entries are transferred, TimeCache asks if you want to change the date. If you do, TimeCache clears the Daily Log‚Äôs entries.
  76.  
  77. You can set TimeCache to warn you before transfering if you‚Äôve entered less than a specified number of hours. You can also set TimeCache to automatically create a timesheet each day, immediately after transferring data to Job Sheets. See the description of the ‚ÄúFile‚Äù menu‚Äôs ‚ÄúSettings‚Äù submenu commands below.
  78.  
  79. WARNING: Transferring data more than once for any date adds that data to Job Sheets. It does not replace data previously entered for that date.
  80.  
  81. How to enter more than 15 lines for a date
  82. The Daily Log has 15 lines for data entry. If you need more than that to cover everything you do in one day, transfer your first 15 lines, then click ‚ÄúCancel‚Äù when TimeCache asks if you want to set up for a new date. Choose the ‚ÄúClear Daily Log‚Äù command in the Daily Log‚Äôs ‚ÄúTimeCache‚Äù menu to erase the Daily Log, and continue entering data. When you choose the ‚ÄúTransfer Data‚Äù command again for that date, TimeCache will warn you that you‚Äôve already entered that date‚Äôs data. Click ‚ÄúOK‚Äù.
  83.  
  84. How to create a timesheet
  85. Use the ‚ÄúCreate Timesheet...‚Äù command in the Daily Log‚Äôs ‚ÄúTimeCache‚Äù menu to create a daily timesheet report. Enter the date for which you want to create a timesheet. TimeCache tells you if there were no entries for the date you requested. Otherwise, it enters the data for that date in a new page of the Timesheets section and switches to the Timesheets section.
  86.  
  87. How to go to a Project‚Äôs Job Sheet
  88. To examine a Job Sheet for a particular project, bring up the Project List dialog, select the project you want to view, and click ‚ÄúGo To‚Äù.
  89.  
  90. How to search for other data
  91. You can search for information by date, client name, project name, job number, client number, even by description, using the ‚ÄúGo‚Äù menu‚Äôs ‚ÄúFind...‚Äù and ‚ÄúFind Again‚Äù commands.
  92.  
  93. To use the Find command, enter a date, number or text you want to find, then click ‚ÄúOK‚Äù. TimeCache beeps if it can‚Äôt find the entry you‚Äôre looking for. If the entry you‚Äôre seeking isn‚Äôt on the card TimeCache takes you to, choose the Find... command again, or choose the Find Again command. Both these commands resume their search on the next card. TimeCache first searches the Archive section, the Job Sheets section, then the Timesheets section.
  94.  
  95. How to speed up TimeCache
  96. After you‚Äôve created a number of Job Sheets and entered many days‚Äô worth of data, you may notice that TimeCache takes longer to transfer data from the Daily Log to Job Sheets, and to create Timesheets. You can regain some speed by archiving Job Sheets for inactive projects in TimeCache‚Äôs Archive section. To do this: select the ‚ÄúProject List‚Äù command from the Daily Log‚Äôs TimeCache menu, select the job you want to archive and click ‚ÄúArchive‚Äù. You can also go to the Job Sheet for that project (see above) and use the ‚ÄúSend To Archive‚Äù command from the Job Sheet screen‚Äôs TimeCache menu.
  97.  
  98. Another strategy that helps speed up TimeCache is to divide up projects. If you have a long-term project with many entries, you can speed up TimeCache by archiving the Job Sheet for that project and creating a new project listing (and therefore a new Job Sheet).
  99.  
  100. How to secure your TimeCache data
  101. TimeCache is like any other file on your hard disk. If your hard disk crashes, or the file becomes corrupted, you can lose all your TimeCache data. To prevent that loss from affecting you, it is crucial to keep a backup copy of your TimeCache file. Copy TimeCache to a floppy disk or other backup medium every day. It‚Äôs worth the little bit of extra time it takes to preserve your data.
  102.  
  103. File size can also eventually be a problem. You should try to keep the size of your TimeCache file to no more than one megabyte. If you get beyond that size, it is a good idea to archive your current TimeCache file and start a new one. You can use the ‚ÄúTC Merger‚Äù stack that comes on the TimeCache disk (for registered users) to easily transfer data from an old file to a new one.
  104.  
  105. Limits on data length
  106. TimeCache only allows you to store up to 30,000 characters in each field of any one Job Sheet. For most people this will never be a problem. But if you have a project that goes on for an extremely long time, or if you enter a large number of very long descriptions on a Job Sheet, you could run up against this limitation. 
  107.  
  108. If you approach the limit, TimeCache prevents you from transfering more data to that Job Sheet, and tells you to archive the Job Sheet and start a new one for that project. If you need to, you can use the ‚ÄúMove A Line...‚Äù command in the Job Sheet section‚Äôs TimeCache menu (see below for a description of this command) to easily move some of your data from the old Job Sheet to the new one.
  109.  
  110. All of TimeCache‚Äôs data is kept in these 30,000 character-limited fields, so you could also conceivably run into this limit when trying to add a new Client, Project or Activity entry to your lists. If you do, it‚Äôs a sign that it‚Äôs time to simplify things.
  111.  
  112.  
  113. The Job Sheets Section
  114. The Job Sheet section is where TimeCache stores the time and billing information on your current projects. There is one Job Sheet for each project listing you create. The Job Sheet shows client name, client number, project name, job number, and, optionally, a custom field of your own creation. (See the description of the File menu‚Äôs Settings/Custom Job Field command.) And of course there are entries for date, activity, note, hours and billings for each job, one per line. There are also totals for hours and billings.
  115.  
  116. How to print a Job Sheet report
  117. You can print Job Sheet data using the File menu‚Äôs ‚ÄúPrint Report‚Äù command. TimeCache first prompts you for the dates you want to print. If you want to print all the entries on the Job Sheet (or Archive), just click ‚ÄúOK‚Äù. Otherwise, enter the first and last dates of the range you want to print.
  118.  
  119. How to export a Job Sheet report
  120. You can export a formatted text file report of any Job Sheet. Depending on the format you choose, you can open these files with a spreadsheet or word processing application, or import them into the ‚ÄúTime Report‚Äù FileMaker file that comes with TimeCache. First select the format (FileMaker or Spreadsheet/Word Processor) with the ‚ÄúExport Job Format‚Äù subcommand from the File menu‚Äôs ‚ÄúSettings‚Äù command.
  121.  
  122. After you select a format, another dialog appears, prompting you to locate the application to open reports in the format you selected. You can skip this if want. This second dialog also has a checkbox marked ‚ÄúPrompt to open app after exporting‚Äù. It tells TimeCache whether or not to open the appropriate application (after confirming that you want to) when you export a report. Check this box in the dialog if you want to open reports after you export them.
  123.  
  124. Each time you use the ‚ÄúExport Report‚Äù command, TimeCache prompts you for the dates you want to report. If you want to report all the entries on the Job Sheet (or Archive), just click ‚ÄúOK‚Äù. Otherwise, enter the first and last dates of the range you want to export.
  125.  
  126. Then TimeCache builds the report and prompts you for a location to store the export file. This can be any hard drive or server volume currently available in the Save File dialog.
  127.  
  128. How to create a Summary Report
  129. TimeCache can quickly summarize all the entries on a Job Sheet into a summary report showing your subtotal for each activity. To create a Summary Report, choose the ‚ÄúSummary Report‚Äù command in the Job Sheets section‚Äôs TimeCache menu. TimeCache creates enters the data into a summary report screen, where you can print the report or export the report data to disk. Use on-screen buttons for these actions. You can also print the report using the File menu‚Äôs ‚ÄúPrint Report‚Äù command. You can export the report using the TimeCache menu‚Äôs ‚ÄúExport Report‚Äù command. TimeCache exports the report in the format you have selected with the ‚ÄúExport Job Format‚Äù setting.
  130.  
  131. How to find a Job Sheet
  132. To go to a Job Sheet for a particular project, use the ‚ÄúSearch Job Sheets...‚Äù command in the ‚ÄúTimeCache‚Äù menu. In the list that appears, highlight the project you want to go to, then click ‚ÄúFind‚Äù.
  133.  
  134. How to change a Job Sheet entry
  135. If you need to edit a Job Sheet field, option-click (hold down the Option key while clicking) on the line you want to change.
  136.  
  137. How to move a line of data to another Job Sheet
  138. You can move Job Sheet entry from one project to another with the ‚ÄúMove A Line...‚Äù command in the ‚ÄúTimeCache‚Äù menu. After you select the command, directions appear on screen. To summarize: click on the date field (furthest left column) of the line you want to move. Then navigate to the Job Sheet you want the line moved to and click ‚ÄúOK‚Äù.
  139.  
  140. How to archive a Job Sheet
  141. You can move a Job Sheet to TimeCache‚Äôs Archive section with the ‚ÄúSend To Archive‚Äù command in the Job Sheet section‚Äôs ‚ÄúTimeCache‚Äù menu.
  142.  
  143. How to delete a line
  144.  If you want to delete a line on a Job Sheet, option-click on the line‚Äôs Hours entry, enter a 0 (zero), and click ‚ÄúOK‚Äù when TimeCache asks if you want to delete that line.
  145.  
  146. How to delete a Job Sheet
  147. If you want to delete a Job Sheet, use the ‚ÄúDelete Project‚Äù command in the Job Sheet‚Äôs ‚ÄúTimeCache‚Äù menu. Once you delete a Job Sheet, you cannot recover the data for that project.
  148.  
  149. The Timesheets Section
  150. When you use the Daily Log‚Äôs ‚ÄúCreate Timesheet‚Äù command, TimeCache creates a timesheet report in the Timesheets section. This section is a collection of all your saved timesheets. You can print a hard copy of any timesheet report.
  151.  
  152. Before printing timesheets
  153. Before you print timesheets, be sure to click on the field marked ‚ÄúClick here to change name‚Äù, and enter your name. If you haven‚Äôt already selected a printing font, select the ‚ÄúReport Printing Font‚Äù subcommand from the File menu‚Äôs Settings command.
  154.  
  155. Timesheet printing options
  156. You can have TimeCache include charges and your custom job field data on printed daily timesheet reports. To include either item, choose the ‚ÄúPrint Settings...‚Äù command from the Timesheets section‚Äôs TimeCache menu, and check either option. Then click ‚ÄúOK.‚Äù
  157.  
  158. How to print a single timesheet
  159. To print a copy of the current timesheet report on your screen, use the File menu‚Äôs ‚ÄúPrint Report‚Äù command, or click the printer icon in the Timesheets screen‚Äôs upper right corner.
  160.  
  161. How to print several timesheets at once
  162. You can print a batch of timesheet reports with the File menu‚Äôs ‚ÄúPrint Batch...‚Äù command. After you select the ‚ÄúPrint Batch‚Äù command, the batch printing palette appears on-screen. Mark each report you want to print by clicking ‚ÄúMark‚Äù in the batch printing palette. The ‚ÄúMarked‚Äù checkbox on that card will be checked. If you change your mind about printing a report, click ‚ÄúMark‚Äù again to uncheck it. Go to other reports you want to print by clicking the arrows in the batch printing palette. After you‚Äôve selected all the reports you want to print, click ‚ÄúPrint‚Äù. If you decide that you don‚Äôt want to print after all, click ‚ÄúCancel‚Äù in the batch printing palette. If you need help using the batch printing palette, click ‚ÄúHelp‚Äù.
  163.  
  164. After you‚Äôve printed a report, the ‚ÄúPrinted‚Äù checkbox will be checked as a reminder.
  165.  
  166. If your reports come out with all the data scrunched up and printed in Portrait (tall) orientation, select the ‚ÄúPage Setup‚Äù command in the File menu and change to Landscape orientaton. It should print correctly from then on.
  167.  
  168. The Archive Section
  169. The Archive section is where you store Job Sheets for projects that have been completed. Removing Job Sheets from the Job Sheets section speeds up some of TimeCache‚Äôs functions. Archived projects look just like Job Sheets, but you cannot edit them. You can print, search, export and delete archived projects using the same commands for those functions as in the Job Sheets section.
  170.  
  171. How to re-activate an archived project
  172. To make an archived project an active Job Sheet again, choose the ‚ÄúActivate Project‚Äù command in the Archive section‚Äôs TimeCache menu.
  173.